North Metro TV

  • Schedule
    • North Metro TV Schedule
    • Public Access Schedule
  • Sports
    • Sports Coverage Schedule
  • News
    • Headlines
    • Local Decision
    • North Metro Gas Prices
  • Rentals & Services
    • Drone Services
  • Public & Classes
    • Home Movies to DVD
    • Free Tech Support
    • Film Your History
    • Movie Man Eric
    • Class Schedule
    • Tips and Tricks
    • Submitting a Program for Playback
    • Membership
    • Downloadable Forms
  • Local Meetings
    • How to Stream a City Meeting
    • Blaine
    • Centerville
    • Circle Pines
    • Ham Lake
    • Lexington
    • Lino Lakes
    • Spring Lake Park
    • Anoka County
    • North Metro Telecommunications Commission
    • Podcasts
  • Home Movies to DVD

More storm cleanup in Blaine

BLAINE, Minn. – (June 22, 2017) – Blaine is still dealing with the after math of a large storm that rolled through earlier this month. As many homeowners are meeting with insurance companies and contractors the city wants to remind people that construction projects do need the proper city permits.

Projects that need a permit include:

    • Roofing/Siding/Stucco Repair Information
    • Window/Door Replacement Information
    • Contractor Consumer Information (MN Dept of Labor and Industry site)
    • When are Construction Permits Required for Residential Construction

Storm Damage Permit Application Process

Due to the large volume of storm related permits, there may be a delay in normal permit processing and scheduling of inspections.

Contractor Options:

  1. Fax the application along with your credit card authorization and a copy of your state license to 763-785-6111.
  2. Mail the application along with your check or credit card authorization and a copy of your state license to The City of Blaine, 10801 Town Square Drive NE, Blaine, MN 55449.
  3. Come to the Building Inspections counter with the application along with your check or credit card authorization and a copy of your state license. At this time we are only able to process 2 permits per contractor at the counter, but you are able to leave the applications and payment, we will process the permits and return them to you by fax or e-mail.
  4. Incomplete applications will not be accepted.

Homeowner Options:

  1. Fax the application along with your credit card authorization to 763-785-6111.
  2. Mail the application along with your check or credit card authorization to:
    City of Blaine
    10801 Town Square Drive NE
    Blaine, MN 55449
  3. Come to the Building Inspections counter and we will process your permit over the counter.

General Inspection Information:

  1. Pictures are required prior to scheduling inspections for replacement of full-frame windows, siding, roofing, and skylights. Details are specified in the notes on the permits and handouts.
  2. An inside the home inspection is required for window replacements to verify current carbon monoxide detectors and smoke detectors requirements are met. An adult must be present for the scheduled date (homeowner or someone authorized by the homeowner).

About Us

  • North Metro TV Schedule
  • Public Access Schedule
  • Meet Our Staff
  • Rules and Regulations
  • Tours
  • Employment
  • Monthly Reports
  • Privacy Policy

Cable Commission

  • Meet The Commission
  • History
  • Franchise
  • Joint Powers Agreement
  • By-Laws
  • Meeting Schedules
  • Agendas & Packets
  • 12520 Polk Street NE
  • Blaine, MN 55434-3148
  • P: 763.780.8241
  • Facebook
  • Twitter
  • YouTube

Copyright © 2025 North Metro TV · Minneapolis Web Design by BizzyWeb · Log in